The Case for Earlier Collaboration in Design
A conversation between Imperium Director Chris Thorne CMgr FCMI and Maria Fethers of Chelmer Mouldings on why specialist trades should be involved in super-prime residential projects before key decisions are fixed.
In the delivery of super-prime residential projects, significant emphasis is placed on design intent: how a home looks, how it feels, and how it is ultimately experienced. Yet the process behind achieving that outcome is often less considered.
Increasingly, it is not the design itself that falls short, but the point at which key disciplines are brought into the conversation.
In a recent discussion between Imperium Director Chris Thorne CMgr FCMI and Maria Fethers from Chelmer Mouldings, suppliers and installers of fibrous plaster, Jesmonite and GRP, this became immediately apparent. Despite operating in entirely different areas of a project, one shaping visible architectural detail, the other responsible for integrated technology and infrastructure, both described the same recurring issue.
"It's about understanding what's required in reality, not just what's shown on drawings. When that happens, everything becomes more aligned."
Maria Fethers, Chelmer Mouldings
This reflects a broader challenge across the industry. Specialist trades, particularly those that influence how a space is resolved in practice, are often introduced once the opportunity to design holistically has already passed.
When design appears complete, but isn't
From a mouldings perspective, the consequences often only become visible on site: misaligned proportions, clashes with joinery, and details that haven't been properly resolved.
"On drawings, everything looks complete, but mouldings are often just represented as a line. In reality, they require space, fixing and coordination. Without that considered early, elements begin to work against each other rather than together."
Maria Fethers, Chelmer Mouldings
From a technology perspective, the same pattern emerges.
"We regularly encounter projects where ceilings are already filled with services before infrastructure has been considered, or layouts that don't account for control systems. By the time we're involved, we're working within constraints that were never designed with integration in mind."
Chris Thorne, Imperium
The result is not a lack of capability, but a lack of alignment. A design that appears resolved on paper, but hasn't been fully coordinated in practice.
The limits of late-stage flexibility
There is a common assumption that these issues can be addressed later. In reality, once key parameters are fixed, flexibility becomes increasingly limited.
"There's a perception that things can always be adjusted, but by that stage the critical decisions have already been made. Infrastructure routes are set, space is allocated, and you're left working within whatever remains. You can usually make it work, but that's not the same as it being right."
Chris Thorne, Imperium
At this stage, the process shifts from achieving the best outcome to simply ensuring the design functions.
From coordination to intent
Where both disciplines have been involved earlier, the nature of the project changes significantly.
"When we're brought in at the right time, the conversation becomes completely different. You're no longer resolving clashes, you're discussing proportion, alignment and how the space should feel. Everything is considered in relation to everything else."
Maria Fethers, Chelmer Mouldings
"You move from asking whether something can be integrated, to what the space is trying to achieve. Lighting, sound and control become part of the architecture, rather than something introduced afterwards."
Chris Thorne, Imperium
This shift moves the process from adaptation to intent.
Simplifying through early coordination
There is often a concern that early collaboration introduces complexity. In practice, both perspectives suggest the opposite.
"Early involvement simplifies the process. You align elements properly, resolve details earlier, and avoid the need for adjustment later."
Maria Fethers, Chelmer Mouldings
"From our side, early coordination removes reactive problem-solving. Systems are planned properly, access is considered, and everything sits more naturally within the building."
Chris Thorne, Imperium
Rather than adding complexity, early collaboration replaces compromise with clarity.
Raising the standard
The conclusion is not that more voices are needed, but that the right expertise must be introduced earlier. Disciplines that directly influence how a home is built and experienced should be involved before key decisions are fixed, while there is still the opportunity to shape the outcome meaningfully.
"If there's one thing that would improve outcomes, it's involving the right specialists earlier and asking more practical questions. How something will be built, how elements interact, and what needs to be decided now to protect the final result."
Chris Thorne, Imperium
"It's about understanding what's required in reality, not just what's shown on drawings. When that happens, everything becomes more aligned."
Maria Fethers, Chelmer Mouldings
When different disciplines arrive at the same conclusion, it signals a broader shift. Better outcomes are not achieved by resolving issues later. They are achieved by bringing the right expertise into the design process at the right time.